PV and battery standards map

Source-map fields for Australian PV, inverter and battery calculator records.

  • Solar, battery and EV · Worksheet fields
  • High-sensitivity table
  • Last checked 13 July 2026

PV and battery standards to confirm before design work

Map PV and battery source areas without reproducing standards or replacing product, DNSP or authority review.

PV and battery standards map
Source areaRecordApplies toBoundary
PV array installation contextSource and edition context for PV array design notes.PV string voltage and module recordsUse authorised current documents for requirements.
Inverter grid connection contextAS/NZS 4777 and DNSP connection source details.Inverter AC cable and export/load recordsDNSP conditions and product instructions remain controlling.
Battery system contextBattery-system source, product and installation context.Battery cable and protection recordsBattery product and BMS requirements must be reviewed.
General electrical installation contextWiring Rules or project source context where relevant.Cable, protection and switchboard recordsThis table does not reproduce controlled requirements.
Product and authority documentsDatasheets, manuals, connection responses and project notes.All energy-system recordsCurrent documents override generic worksheet context.
  • Use this map to keep the governing source clear.
  • It is not a substitute for current standards, DNSP conditions, product instructions or licensed review.

Where the standards map supports solar review

Use the map to identify the standards context that needs checking before project-specific design, installation or verification decisions.

Limits of the PV and battery standards map
ItemValue
PurposeMap PV and battery source areas without reproducing standards or replacing product, DNSP or authority review.
How to use the sourceSource-map table only; PV and battery formulas live on calculator and chart pages.
Standards and project contextAS/NZS 5033, AS/NZS 4777, AS/NZS 5139 and AS/NZS 3000 context noted for project review; verify current editions.
Where judgement is still neededUse this table for lookup, labelling or worksheet context; do not treat it as a project-specific calculation result.
Before relying on itConfirm current standards, local authority requirements, DNSP conditions, project documents and manufacturer data before relying on a decision.

Authority basis for PV and battery standards

Review the cited source, checked date and project scope before using the standards map as decision context.

PV and battery standards map source basis
ItemValue
SourceStandards Australia PV, inverter and battery-system standards context plus AUWiring calculator field models.
Source typeExternal authority or standards source
Derivation basisSource-map table for standards context; controlled standard text, product listings and authority conditions are not reproduced.
Last checked2026-07-13
Review intervalAnnual or when PV, inverter, battery standards, DNSP requirements or calculator fields change.
Review triggerStandards update, DNSP requirement change, product rule change, calculator field change or project feedback.
Version usedR32-2026-07-13
Australian applicationAustralia; standards, DNSP, product listing, local authority and project requirements govern final decisions.