Load schedule fields for switchboard records

Show the record fields needed for load schedules without prescribing a universal maximum-demand method.

Load schedule fields
FieldPurposeTypical sourceBoundary
Board referenceTies the schedule to a real switchboard.Drawings or board scheduleDo not combine boards without a clear record.
Load groupSeparates lighting, socket, mechanical and dedicated loads.Load schedule or design noteGrouping affects interpretation.
Phase allocationShows L1, L2 and L3 placement.Circuit schedulePhase allocation must be checked before balancing.
Connected loadRecords load before demand treatment.Nameplate, schedule or design loadConnected load is not automatically demand load.
Demand factor sourceKeeps the entered factor traceable.Project reviewer or governing sourceThis table does not publish universal factors.
  • Use the table to make maximum-demand inputs traceable.
  • Final demand assessment remains a project and standards review task.

Before demand checks reach the calculator

Capture each circuit and load assumption consistently so maximum-demand and phase-balance results can be checked against the schedule.

Where the schedule still needs design judgement
ItemValue
PurposeShow the record fields needed for load schedules without prescribing a universal maximum-demand method.
How to use the sourceField table only; demand arithmetic lives on the maximum-demand calculator.
Standards and project contextAS/NZS 3000 maximum-demand context noted for project review; verify current rules and authority requirements.
Where judgement is still neededUse this table for lookup, labelling or worksheet context; do not treat it as a project-specific calculation result.
Before relying on itConfirm current standards, local authority requirements, DNSP conditions, project documents and manufacturer data before relying on a decision.

Standards basis for load schedule fields

Keep the standards context, checked date and switchboard scope visible beside the schedule fields.

Load schedule fields source basis
ItemValue
SourceAUWiring maximum-demand and phase-balancing calculator field models.
Source typeAUWiring field model with standards context
Derivation basisAUWiring worksheet field table; no controlled demand-factor tables are reproduced.
Last checked2026-07-13
Review intervalAnnual or when maximum-demand fields, project-record practice or standards context changes.
Review triggerCalculator field change, standards update, authority context change or project feedback.
Version usedR12-2026-07-13
Australian applicationAustralia; project and authority context can override worksheet structure.